Project overview
Sheffield Children’s Hospital required their seven ageing, inefficient plantrooms to be transformed and integrated into a new energy centre.
Our solution
Our Mechanical and Electrical Building Services Design team provided the technical design for linking seven ageing, inefficient plantrooms into a new energy centre with a 550kW CHP engine and efficient condensing gas-fired boilers.
The installation of equipment within the new energy centre was one the most challenging coordination tasks we’ve been involved with and following the success of the project, we were appointed to look at the next phase, taking waste heat from the CHP flue gas onto a new absorption chiller system.