Nottingham City Council, Boots
Nottingham Enterprise Zone
Waldeck provided a multi-disciplinary service working at the Boots Headquarters campus in Nottingham for Nottingham Regeneration Ltd (in Partnership with Nottingham City Council and the Landowner partner; Boots) including the remediation of the former manufacturing areas for redevelopment for residential and commercial use.
PEEL PORTS GROUP
PORT OF SHEERNESS, ROYAL BRIDGE RORO PONTOON
The project includes the replacement of an existing RoRo pontoon which is at the end of its useable life. Working with Peel Ports, Waldeck provided a feasibility study, followed by digital capture services to understand the condition of the RoRo pontoon and surrounding area before further works could be carried out.
PEEL PORTS GROUP
PORT OF SHEERNESS, FORMER STEELWORKS SITE
Peel Ports Groups ambitious plans for the former steelworks site include accommodation for various uses, including automotive parking and servicing, covered warehousing and open storage for general ports’ use.
Jaguar Land Rover
FA3 Project, Jaguar Land Rover
Waldeck provided a multi-disciplinary service working with Jaguar Land Rover to create a new trim and final line facility to enable production of 4×4 models in Solihull worth over £50million.
Buckingham Group Ltd
Coventry Station & Multi-Storey Car Park
Coventry City Council recently invested £82million in creating a new-look gateway for passengers who arrive in the city by train. The Council has been working in partnership with Network Rail, rail operators, Transport for West Midlands, Friargate Coventry LLP and other stakeholders, including our team at Waldeck.
Peel Ports
Port of Sheerness Redesign
Waldeck were appointed by Peel Ports to support them with the redevelopment of the Royal Bridge Pontoon area of the Port of Sheerness.
Lincolnshire Heritage Trust
St Johns Workhouse Refurbishment
Waldeck were appointed by the Lincolnshire Heritage Trust to provide Civil and Structural Engineering support for the refurbishment of the Grade 2 listed building.
EDF Energy
West Burton Power Station
Waldeck were appointed to provide Civil and Structural Engineering support services for EDF Energy’s new £600 million combined cycle gas turbine (CCGT) power station at West Burton in Nottinghamshire.
Peel Ports
Thamesteel Port Masterplanning
Waldeck were appointed by Peel Ports to provide Civil and Structural Engineering support for the masterplanning at one of their sites.
Iceland Frozen Foods
Cold Store Refurbishment
Waldeck were appointed by Iceland Frozen Foods to work alongside DHL to convert an existing chill facility in Warrington into a frozen food facility.
Turners Distribution
Cold Store Facility
Waldeck were appointed by Turners Distribution to provide Civil and Structural Engineering for a Cold Store at their site in Soham.
Jaguar Land Rover
Classic Car Workshop
Waldeck were appointed to provide Civil and Structural Engineering services for a new showroom in Coventry for Jaguar Land Rover’s classic cars.